{"id":1029,"date":"2019-01-05T09:10:42","date_gmt":"2019-01-05T08:10:42","guid":{"rendered":"http:\/\/skyaccess.pl\/?page_id=1029"},"modified":"2022-10-05T15:02:02","modified_gmt":"2022-10-05T13:02:02","slug":"powerpoles","status":"publish","type":"page","link":"http:\/\/skyaccess.pl\/en\/transmission_lines\/powerpoles\/","title":{"rendered":"POWER POLES INSTALLATION"},"content":{"rendered":"

We run power poles construction works \u2013 110 kV, 220 kV & 400 kV. We use the rotary method and the lifting method using derrick. With having the proper equipment we are able to perform assembly works also in difficult terrain conditions.<\/p>\n

Our equipment:
\n– 2x Toyota Hilux with canopy and the OFF-ROAD equipment,
\n– 2x Toyota Hilux with the OFF-ROAD equipment,
\n– 2x All-terrain truck \u2013 Honker,
\n– 2x Derrick FAL 181 set & TESMEC hydraulic winch ARS 402.<\/p>\n

Our main realizations:
\n– 400 kV line construction Gda\u0144sk Przyja\u017a\u0144-\u017bydowo Kierzkowo
\n– 400 kV line construction \u017bydowo Kierzkowo-S\u0142upsk