POWER POLES INSTALLATION

We run power poles construction works – 110 kV, 220 kV & 400 kV. We use the rotary method and the lifting method using derrick. With having the proper equipment we are able to perform assembly works also in difficult terrain conditions.

Our equipment:
– 2x Toyota Hilux with canopy and the OFF-ROAD equipment,
– 2x Toyota Hilux with the OFF-ROAD equipment,
– 2x All-terrain truck – Honker,
– 2x Derrick FAL 181 set & TESMEC hydraulic winch ARS 402.

Our main realizations:
– 400 kV line construction Gdańsk Przyjaźń-Żydowo Kierzkowo
– 400 kV line construction Żydowo Kierzkowo-Słupsk

POWER POLES INSTALLATION

All works are conducted by qualified rope access technicians, working in IRATA system who have many years of experience in high altitude works as well as high altitude rescue operations within Poland and abroad.